Project Description:
The installation of a Methane Under-slab Ventilation System and Vapor Barrier which includes 117 vertical extraction wells, over 9500 ft of low flow gas collection piping systems, more than 16,000 ft of collection laterals and headers, a ventilation layer consisting of approximately 12,500 ton of stone at final grade, 334,000 SF of methane vapor barrier, methane sensors and alarms, flare and blower installation, gas system balancing and testing.
Service Overview || Projects Main Page